Stephen Hose --- resume 0n-line
Stephen Hose --- resume on-line
Qualifications --- Stephen Hose resume
 


Rigging

▪ Structural Steel
  Placement of pre-cast concrete
  Materials, tools & equipment
  Dual crane lifts
  Performing dogman work
  Radio communication
  Remove & install pipes, valves, vessels, pumps, etc.

Scaffolder

  Erecting pre-fabricated, tube and coupler scaffolding
  Inspection of pre-fabricated, tube and coupler scaffolding
  Tanks scaffolding

Confined Space Training

  Tenix (Altona)
  Mobil (Altona)
  Visy Pulp & Paper Mill (Tumut)
  Quenos (Altona)
  Shell (Geelong)

 


Dogman

  160 tonne (HT 65)
  16 tonne Kapelco (MS 25)
  50 tonne (HT 32)
  25 tonne Franna (FC 48)
  18 tonne Franna (FC 44)
  50 tonne (HT 51)
  100 tonne (FT 51)
  7 tonne (MS 20)
  Variation of 20-50 tonne slew
  Variation of 14-25 tonne Frann

Materials Expediter

  Piping
  Pipe Fittings
  Structural Steel
  Valves

Computer Experience

  Store Documents
  Assocated Equipment
  Pumps

     
 Read More  
Stephen Hose --- resume on-line
QualityWebSolutions.com.au

 

Personal details --- Stephen Hose resume Qualifications --- Stephen Hose resume Work Skills --- Stephen Hose resume Employment details --- Stephen Hose resume References & Contact --- Stephen Hose resume Privacy Policy - copyright 2007  Stephen Hose.  All rights reserved.